Site Survery at CSR

2/20/2013

3 Comments

 
Date: 20 Feb 2013

Location: CSR, Shah Alam

Job Scope: Lifting of 1 unit boiler and accessories to its designated position. Lifting to be carried out through a hole on the roof top. Roof is to be dismantle. Boiler is approximately 10 tons.
Picture
Picture
Crane parking position is restricted by the road width. Our crane needs at least 9m for its extension of outrigger but the road is only 7m. Therefore, alternate parking position is needed.
Picture
The alternate parking position is further away from the initial parking position. Which causes the working radius to be 24m instead of 10m.
Picture
Due to the increase in working radius a proposed 160ton crane is needed rather than the initial 80ton crane. The boiler will be lifted according to the diagrams above. It will be lifted from the transportation vehicle to the designated position over and above the pipe rack and then into the roof opening.
Walkie-talkie will be used for communication between rigger and crane operator.
Lifting will be carried out at a later date upon confirmation from customer.

3 Comments
best assignment writing services uk link
4/25/2018 04:32:11 am

Very good for sharing the pictures of your site survey at the construction site and all are working perfectly. You should follow the safety rules for reduce the accidents and incidents while the construction for the labors and other site workers.

Reply
robux generator link
6/28/2018 03:42:33 am

Hey friends if you want to generate lots of robux for free then must try my link

Reply
Jerry link
5/9/2019 07:02:56 pm

Wow, 10 tons!

Reply



Leave a Reply.

    Addam Sew

    Addam works as a supervisor at a crane and transport company in Malaysia. 